The use of the hot press is not always in operation. There are also times when it is shut down for maintenance. Some still need to be cleaned and maintained regularly. Some requirements should also be done in place during cleaning, which is also a kind of maintenance.
Let's first talk about the requirements for the installation of the lower hot press, in which the steam inlet and outlet of the adjacent cool hot pressing plate are configured in the opposite way, which is also conducive to the uniform heating of the slab. The cleaning of this part needs to be operated after the temperature drops down. There should be no large amount of ponding during cleaning, which is also to prevent corrosion.
The staff shall clean the tools before operation. Only when the cleaning tools are clean can the hot press equipment be cleaned. In order to prolong its service life, the oil filling part of the equipment shall be checked in time during cleaning to see if there is oil leakage, and the cleaning process shall also be checked.
Name:Mr. XU
Tel:13563979777
Company:Linyi Senyuan Wood Machinery Co., Ltd.
Add:Machinery Industrial Park of Feixian Economic Development Zone (intersection of Xingda road and Xuyou Road)